Record No:
|
CB 119106
Version:
1
|
Council Bill No:
|
CB 119106
|
Type:
|
Ordinance (Ord)
|
Status:
|
Passed
|
Title:
|
AN ORDINANCE related to fees and charges for permits and activities of the Seattle Department of Construction and Inspections and related fees by other departments, and technical corrections; amending Seattle Municipal Code Chapter 22.900B, General Provisions; Chapter 22.900C, Fees for Land Use Review; Chapter 22.900D, Fees for New and Altered Buildings and Equipment; Chapter 22.900E, Fees for Certificates and Registrations; Chapter 22.900F, Compliance and Other Inspections; and Chapter 22.900G, Fees Collected for Other Departments.
|
CITY OF SEATTLE
ORDINANCE __________________
COUNCIL BILL __________________
title
AN ORDINANCE related to fees and charges for permits and activities of the Seattle Department of Construction and Inspections and related fees by other departments, and technical corrections; amending Seattle Municipal Code Chapter 22.900B, General Provisions; Chapter 22.900C, Fees for Land Use Review; Chapter 22.900D, Fees for New and Altered Buildings and Equipment; Chapter 22.900E, Fees for Certificates and Registrations; Chapter 22.900F, Compliance and Other Inspections; and Chapter 22.900G, Fees Collected for Other Departments.
body
BE IT ORDAINED BY THE CITY OF SEATTLE AS FOLLOWS:
Section 1. Section 22.900B.010 of the Seattle Municipal Code, last amended by Ordinance 125184, is amended as follows:
22.900B.010 Base fee and hourly rate
A. The SDCI base fee shall be charged as specified in this Subtitle IX and shall be (($210)) $216.
B. Any services provided by the Department for which an hourly charge is assessed shall be charged at a rate specified in this Subtitle IX.
The hourly rate for land use review is (($315)) $324. The rate for all other hourly fees is (($210)) $216 an hour except where a different hourly rate is specified in this Subtitle IX. Where “SDCI hourly rate” is specified in this Subtitle IX, the rate is (($210)) $216 an hour.
C. ((Where)) If an hourly rate is specified, overtime shall be charged at that same rate. ((Where)) If no hourly rate is specified, overtime shall be charged at (($210)) $216 an hour. All overtime shall require approval by the Director. The minimum fee for each overtime request shall be one hour, with minimum increments of 1/4 hour, in addition to other permit fees established by this Subtitle IX.
Section 2. Section 22.900B.020 of the Seattle Municipal Code, last amended by Ordinance 125184, is amended as follows:
22.900B.020 Miscellaneous and special fees
* * *
D. Address ((Change)) change. The fee to correct the address on an application or, if applicable, on an issued permit is (($57)) $58.50. If an address change is requested that is unrelated to an application for a permit or for an issued permit, a fee of one ((times)) multiplied by the base fee shall be assessed.
E. Copies of electronic and microfilm records. Charges for plans reproduced from electronic records or from the microfilm library are shown in Table B-1 for 22.900B.020.
Table B-1 for 22.900B.020-Fees for Reproductions from Electronic or Microfilm Records |
Page Size |
Price |
Electronic Records |
8 1/2" x 11" |
(($0.60)) $0.65 per printed page |
11" x 17" |
(($0.60)) $0.65 per printed page |
Microfilm Records |
8 1/2" x 11" |
(($1.40)) $1.45 per copied page |
11" x 17" |
(($1.40)) $1.45 per copied page |
Both sizes |
$0.10 per scanned image |
* * *
Section 3. Section 22.900C.010 of the Seattle Municipal Code, last amended by Ordinance 125248, is amended as follows:
22.900C.010 Land use fees
A. Land Use ((Review Fees)) review fees. The land use review fee for Master Use Permits, Council and Hearing Examiner approvals, environmentally critical area reviews, shoreline reviews, and other miscellaneous reviews, research, and services shall be charged according to Table C-1 for 22.900C.010 unless otherwise specified. For any review, research, or service that is not listed in Table C-1 for 22.900C.010, the minimum fees will be determined by the Director based on the estimated complexity of work, but in no case shall be less than 0.5 hours ((times)) multiplied by the current Land Use hourly rate and in no case more than 10 hours ((times)) multiplied by the current Land Use hourly rate. Additional hours worked that exceed the number covered by the minimum fee shall be charged at the current Land Use hourly rate and are required to be paid at the time of invoicing and/or prior to approval of permits. Land use review that is subject to the Land Use hourly rate may include, but is not limited to: review time for ((more than one)) each technical reviewer ((,)) ; pre-application services ((,)) ; project review ((,)) ; permit issuance ((,)) ; and continued review during the building permit and construction approval phases of the project as well as inspections or site visits during construction or post construction to ensure compliance with requirements of approval. Land Use hourly rate also includes time spent preparing for and defending a Director’s decision or recommendation if appealed to the Hearing Examiner.
* * *
Table C-1 for 22.900C.010-LAND USE FEES |
A. MASTER USE PERMIT, ENVIRONMENTAL CRITICAL AREAS, CITY COUNCIL, and HEARING EXAMINER APPROVALS |
Hours worked beyond those covered by minimum will be charged the Land Use hourly rate, unless otherwise noted, and are payable at time of invoice. |
Type of Land Use Review |
Minimum Fee |
General-first 10 hours of review |
Land Use Hourly × 10 |
Low-Income Housing-first 24 hours of review1 |
Land Use Hourly × 10 |
1. Administrative conditional uses (ACUs) ACUs for community centers, child care centers, adult care centers, private schools, religious facilities, and public and private libraries in single-family and multi-family zones shall be charged a minimum fee of (($1,788)) $1,840 for the first 20 hours. Additional hours shall be charged at the rate of (($315)) $324 an hour. This exception applies if the application is for an ACU only, or an ACU combined with a variance application. |
2. Design Review The minimum fee for Administrative Design Review, Master Planned Community Design Review and Streamlined Design Review is (($3,150)) $3,240. The minimum fee for full Design Review is (($6,300)) $6,480, which covers the first 20 hours of review. Refer to subsection 15 of this Table C-1 for 22.900C.010 for fees related to Design Review for Tree Protection. |
3. Environmental reviews (SEPA), including projects with more than one addressed site. |
4. Environmentally critical areas (ECA) |
a. Environmentally Critical Areas variance2 |
b. ECA Exception |
c. Environmentally Critical Areas Administrative Conditional Use |
5. Shoreline permits |
a. Substantial development permits |
b. Variances2 and conditional uses |
6. Short subdivisions3; refer to subsection 10 of Table D-2 for 22.900D.010 for additional fees that may apply to this permit type |
7. Special exceptions |
8. Variances2 Variances for community centers, child care centers, adult care centers, private schools, religious facilities, and public and private libraries in single-family and multi-family zones shall be charged a minimum fee of (($1,788)) $1,840 for the first 20 hours. Additional hours shall be charged at the rate of (($315)) $324 an hour. This exception applies if the application is for a variance only, or a variance combined only with an ACU application. |
9. Type II land use approvals such as, but not limited to, planned community/residential development, major phased developments and other Type II approvals that are not categorized otherwise in this Table C-1 for 22.900C.010. |
10. The minimum fee for Council conditional uses, Rezones, Public Projects, and all other Type IV and Type V land use approvals shall be (($6,300)) $6,480, which covers the first 20 hours of review. |
11. Full subdivisions4; refer to subsection 10 of Table D-2 for 22.900D.010 for additional fees that may apply to this permit type |
12. Reserved |
13. Reserved |
B. MISCELLANEOUS HOURLY LAND USE REVIEWS, RESEARCH, AND OTHER SERVICES |
Hours worked beyond those covered by minimum will be charged the Land Use hourly rate, unless otherwise noted, and payable at time of invoice. |
Type of Land Use Review |
Minimum Land Use Review Fee |
14. Concurrency |
Reserved |
15. Design Review for Tree Protection5 |
a. Design review required by Section 25.11.070 or Section 25.11.080 to protect exceptional tree if no other land use reviews are required |
Land Use Hourly × 10 |
b. Design review elected by applicant for tree protection |
Land Use Hourly × 10 |
16. Other Environmentally Critical Area (ECA) Review, inspection, and site visit under Chapter 25.09 or Chapter 23.60A, including but not limited to: |
Land Use Hourly × 1 |
a. ECA review for Wetlands, Fish, & Wildlife Habitat Conservation Areas on land use or construction permits shall be charged on an hourly basis |
|
b. Review to determine Environmentally Critical Area exemption for Wetlands and Riparian Corridor and Shoreline ECAs shall be charged on an hourly basis |
|
c. Other miscellaneous ECA reviews, inspections, or site visits as required by code or as a condition of approval shall be charged on an hourly basis |
|
17. Early design guidance |
Land Use Hourly × 10 |
18. Establishing use for the record: Refer to subsection 9 of Table D-2 for 22.900D.010 for additional fees that may apply to this permit type |
Land Use Hourly × 2 |
19. Extensions of Type IV Council Land Use Decisions |
Land Use Hourly × 2 |
20. Land Use Code Interpretations6 |
Land Use Hourly × 10 |
21. Letters for detailed zoning analysis or permit research |
Land Use Hourly × 4 |
22. Lot Boundary Adjustment, Temporary Use > 4 weeks; refer to subsection 10 of Table D-2 for 22.900D.010 for additional fees that may apply to this permit type |
Land Use Hourly × 5 |
23. Major Institution - review of annual plan |
Land Use Hourly × 6 |
24. Major phased development permit - minor amendment |
Land Use Hourly × 2 |
25. Neighborhood planning |
Reserved |
26. Noise survey review and variance |
See Table F-2 for 22.900F.020 Noise Fees |
27. Open space remainder lots and surplus state property |
Land Use Hourly × 4 |
28. Pre-application conference7 |
Land Use Hourly × 2 |
29. Property Use and Development Agreement (PUDA) - minor amendment |
Land Use Hourly × 2 |
30. Public benefit feature review |
Land Use Hourly × 2 |
31. Renewals |
Land Use Hourly × 2 |
32. Revisions other than shoreline revisions |
Land Use Hourly × 1 |
33. School use and school development advisory committee reviews |
Land Use Hourly × 10 |
34. Shoreline exemptions |
Land Use Hourly × 1 |
35. Shoreline permit revisions not due to required conditions |
Land Use Hourly × 2 |
36. Special accommodation |
Land Use Hourly × 2 |
37. Structural building overhangs and areaways as a separate component |
Land Use Hourly × 2 |
38. Tree and Vegetation Restoration Review in ECA above minimum threshold where SEPA is not required other than for the restoration (subsection 25.09.070.E.1.b) |
Land Use Hourly × 2 |
39. Street Improvement Exceptions on a Land Use permit |
Land Use Hourly × 2 |
40. Hazardous Tree Removal |
Land Use Hourly × 1 |
C. NON-HOURLY LAND USE FEES |
Type of Land Use Review |
Fee |
((40.)) 41. Curb cuts as a separate component |
a. Single-family residential |
(($86)) $88.35 each |
b. Other than single-family residential |
(($170)) $174.70 each |
((41.)) 42. File Management |
SDCI Base Fee × 1 |
a. Placing projects on hold at applicant request |
|
b. Splitting or combining projects |
|
((42.)) 43. Intake appointments for land use reviews; fee is charged for each occurrence |
SDCI Base Fee × 1 |
((43.)) 44. Notice. All notice is charged based upon type for each occurrence.8 |
a. Land use information bulletin (GMR notice) |
SDCI Base Fee × 1 |
b. Posting large sign or placards |
(($130)) $133.60 |
c. Mailed notice |
SDCI Base Fee per 500 pieces of mail or portions thereof |
d. DJC decision publication |
(($204)) $209.60 |
e. Neighborhood newspaper publication |
Rate charged by newspaper |
f. Public meeting room rental |
(($131)) $134.60 |
((44.)) 45. Rebuild Letters |
a. With Research |
SDCI Base Fee × 1 |
b. Without Research |
(($44)) $45.20 |
((45.)) 46. Records research by the Public Resource Center |
SDCI Base Fee × 1 |
((46.)) 47. Recording Fees, for LBA or Short Subdivision |
Rate charged by King County9 |
((47.)) 48. Shoreline Extensions |
SDCI Base Fee × 1 |
Footnotes to Table C-1 for 22.900C.010 ((:)) 1For purposes of these land use fees, low-income housing is housing that both (1) satisfies the definition of “housing, low income” in Section 23.84A.016; and (2) where at least 50 percent of the total gross floor area of each structure on the site is committed to low-income housing use for at least 20 years. 2The single variance fee shall be applicable whether the project requires one or multiple variances. 3Includes short subdivisions in environmentally critical areas. 4Includes unit-lot subdivisions and full subdivisions in environmentally critical areas. 5This fee applies if design review is initiated only for tree protection and the application has no other review under Items 1-14. 6The fees for interpretations of Chapters 25.12, 25.16, 25.20, 25.21, 25.22, ((and)) 25.24, and 25.30 shall be collected by the Director of the Department of Neighborhoods. 7The pre-application conference fee covers a one-hour conference and one hour of research and/or follow-up review time that normally occurs, for a total of two hours. Additional pre-application review time will be charged at the Land Use hourly rate. See also ((Section)) subsection 22.900C.010.E. 8Additional notice may be given in circumstances including but not limited to the following: reinstallation of environmental review signs ((,)) ; reposting of the land use review or environmental signs ((,)) ; new component reviews added subsequent to the original notice ((,)) ; revised decisions ((,)) ; and changes to the scope of the project. 9Recording fees will be charged the current rate as established and charged by King County at the time of document recording. |
Section 4. Section 22.900D.010 of the Seattle Municipal Code, last amended by Ordinance 125184, is amended as follows:
22.900D.010 Development permit fees
* * *
Table D-1 for 22.900D.010-Calculation of the Development Fee Index |
Total Valuation |
Development Fee Index |
$0 to $1,000 |
$210 for the first $1,000 of value or fraction thereof |
$1,001 to $25,000 |
$210 for the first $1,000 of value plus $1.25 for each additional $100 of value or fraction thereof |
$25,001 to $50,000 |
$510 for the first $25,000 of value plus $1.20 for each additional $100 of value or fraction thereof |
$50,001 to $75,000 |
$810 for the first $50,000 of value plus $1.15 for each additional $100 of value or fraction thereof ((.)) |
$75,001 to $100,000 |
$1,097.50 for the first $75,000 of value plus $1.10 for each additional $100 of value or fraction thereof |
$100,001 to $175,000 |
$1,372.50 for the first $100,000 of value plus $5.50 for each additional $1,000 of value or fraction thereof |
$175,001 to $250,000 |
$1,785 for the first $175,000 of value plus $5.50 for each additional $1,000 of value or fraction thereof |
$250,001 to $500,000 |
(($2,197.25)) $2,197.50 for the first $250,000 of value plus $5.25 for each additional $1,000 of value or fraction thereof |
$500,001 to $750,000 |
$3,510 for the first $500,000 of value plus $5 for each additional $1,000 of value or fraction thereof |
$750,001 to $1,000,000 |
$4,760 for the first $750,000 of value plus $5 for each additional $1,000 of value or fraction thereof |
$1,000,001 to $1,500,000 |
$6,010 for first $1,000,000 of value plus $4.50 for each additional $1,000 of value or fraction thereof |
$1,500,001 to $2,000,000 |
$8,260 for the first $1,500,000 of value plus $4.50 for each additional $1,000 of value or fraction thereof |
$2,000,001 to $2,500,000 |
$10,510 for first $2,000,000 of value plus $4 for each additional $1,000 of value or fraction thereof |
$2,500,001 to $3,000,000 |
$12,510 for the first $2,500,000 of value plus $4 for each additional $1,000 of value or fraction thereof |
$3,000,001 to $3,500,000 |
$14,510 for first $3,000,000 of value plus $3.50 for each additional $1,000 of value or fraction thereof |
$3,500,001 to $4,000,000 |
$16,260 for first $3,500,000 of value plus $3.50 for each additional $1,000 of value or fraction thereof |
$4,000,001 to $4,500,000 |
$18,010 for first $4,000,000 of value plus $3 for each additional $1,000 of value or fraction thereof |
$4,500,001 to $5,000,000 |
$19,510 for the first $4,500,000 of value plus $3 for each additional $1,000 of value or fraction thereof |
$5,000,001 to $10,000,000 |
$21,010 for the first $5,000,000 of value plus $2.50 for each additional $1,000 of value or fraction thereof |
$10,000,001 to $25,000,000 |
$33,510 for the first $10,000,000 of value plus $2.50 for each additional $1,000 of value or fraction thereof |
$25,000,001 to $50,000,000 |
$71,010 for the first $25,000,000 of value plus $2.50 for each additional $1,000 of value or fraction thereof |
$50,000,001 to $75,000,000 |
$133,510 for the first $50,000,000 of value plus $2 for each additional $1,000 of value or fraction thereof |
$75,000,001 to $100,000,000 |
$183,510 for the first $75,000,000 of value plus $2 for each additional $1,000 of value or fraction thereof |
$100,000,001 to $150,000,000 |
$233,510 for the first $100,000,000 of value plus $1.50 for each additional $1,000 of value or fraction thereof |
$150,000,001 to $200,000,000 |
$308,510 for the first $150,000,000 of value plus $1.50 for each additional $1,000 of value or fraction thereof |
$200,000,001 and up |
$383,510 for the first $200,000,000 of value plus $1.25 for each additional $1,000 of value or fraction thereof |
Table D-2 for 22.900D.010 - Calculation of Development Fees Determined by Value |
|
Percent of Development Fee Index (DFI) Calculated from Project Value as Specified in Table D-11 for 22.900D.010 |
Type of Development |
Permit Fee |
Plan Review Fee |
1. Building, with or without mechanical, with or without use |
100% of DFI |
100% of DFI |
2. STFI (Subject to field inspection - building and/or mechanical)2 |
100% of DFI |
40% of DFI |
3. Energy code compliance review using Total UA Alternative and/or Simulated Performance Alternative |
(included in subsection 1 of this Table D-2 for 22.900D.010) |
SDCI hourly rate, 1 hour minimum |
Table D-2 for 22.900D.010 - Calculation of Development Fees Determined by Value |
4. Mechanical permit: |
a. Submitted as part of a building permit application (if associated with other work) |
(included in subsection 1 of this Table D-2 for 22.900D.010) |
Mechanical Review at the SDCI hourly rate, 1 hour minimum |
b. If ≥ $50,000 in value and submitted separately from a building permit application (if associated with other work) or if applied for as a mechanical only permit; also see Section 22.900D.090 for mechanical equipment fees |
100% of DFI |
All other applicable reviews at the SDCI hourly rate, 1 hour minimum |
c. If < $50,000 in value and submitted separately from a building permit application (if associated with other work) or if applied for as a mechanical only permit; also see Section 22.900D.090 for mechanical equipment fees |
100% of DFI |
100% of DFI for Initial Mechanical Review; all other applicable reviews (including Mechanical Corrections Reviews) at the SDCI hourly rate, 0.5 hour minimum |
5. Blanket permit review fees: |
a. Initial tenant alterations applied for within 18 months of the date of issuance of the first certificate of occupancy within a building where the area of work is more than 50,000 sq. ft. |
(($2.65)) $2.75 per 100 square feet1 |
(($3.05)) $3.15 per 100 square feet1 |
b. Initial tenant alterations applied for after 18 months of the date of issuance of the first certificate of occupancy |
100% of DFI |
60% of DFI |
6. Initial tenant alterations applied for within 18 months of the date of issuance of the first certificate of occupancy (nonblanket permit initial tenant improvements to shell and core)3 |
50% of DFI based on new building value of shell and core |
50% of DFI based on new building value of shell and core |
7. Standard plans: |
a. Establishment of standard plan, including temporary structures. (For swimming pools, see subsection 16 of this Table D-2 for 22.900D.010.) |
100% of DFI |
200% of DFI, plus SDCI hourly rate for review/ approval of “options” |
b. Establishment of already permitted plan as standard plan |
100% of DFI |
100% of DFI, plus SDCI hourly rate for review/ approval of “options” |
c. Subsequent reviews of standard plan, other than temporary structures |
100% of DFI |
60% of DFI, plus SDCI hourly rate for review/ approval of “revisions” |
d. Subsequent reviews of standard plans for temporary structures |
See subsection 18 of this Table D-2 for 22.900D.010 |
See subsection 18 of this Table D-2 for 22.900D.010 |
8. Factory-built housing and commercial structures |
a. Modular construction, 3 or fewer stories |
Base fee x 1 |
Base fee x 1 for each module |
b. Modular construction, more than 3 stories |
Base fee x 1 |
Base fee x 1 for each module, plus SDCI hourly rate for structural review |
Special Development Fees |
Type of Development |
Permit Fee |
Plan Review Fee |
9. Establishing use for the record |
a. Applications with no construction |
Base fee x 1.5 |
None |
b. Applications with construction: Refer to subsection 17 of Table C-1 for 22.900C.010 for additional Land Use Fees that apply to this permit type |
100% of DFI |
100% of DFI |
10. Building review associated with platting actions or LBAs |
None |
SDCI hourly rate; 0.25 hour minimum |
11. Noise survey reviews |
None |
See Table F-2 for 22.900F.020 Noise Fees |
12. Parking facilities |
a. Outside a building |
See Section 22.900D.060 |
b. Within or on a building |
See subsection 22.900D.010.C |
13. Renewal (or Reestablishment) of development permits and/or separate mechanical permits See subsection 22.900D.010.G and subsection 22.900D.010.K for exceptions and modifications to fee |
Base fee x 1.5 |
SDCI hourly rate |
14. Single-family earthquake retrofit |
a. Permit for work in full compliance with Project Impact Standards/Plans |
Base fee x 1 |
None |
b. Permit for work in partial compliance with Project Impact Standards/Plans with additional engineering design of those portions not in compliance |
Base fee x 1 |
SDCI hourly rate with 1 hour minimum |
c. Voluntary seismic upgrades requiring full engineering/design and not per Project Impact Standards/Plans |
100% of DFI |
100% of DFI |
15. Review of Unreinforced Masonry Building Designation or Retrofit Standard |
a. Review to change unreinforced masonry bearing wall building designation |
None |
SDCI base fee x 1 |
b. Review to determine seismic retrofit standard of previously retrofitted unreinforced masonry building |
None |
SDCI hourly rate; 1 hour minimum |
16. Special inspection |
Base fee x 1 |
|
17. Swimming pools4 |
a. Unenclosed pools accessory to Group R-3 Occupancy |
Base fee x 4 |
|
b. Unenclosed pools accessory to occupancies other than Group R-3 |
Base fee x 6 |
|
c. Principal use unenclosed pools |
Base fee x 6 |
|
d. Future construction of an unenclosed swimming pool |
Base fee x 1 |
|
e. Initial approval of standard plan for swimming pool accessory to Group R-3 Occupancy |
Base fee x 5 |
|
f. Subsequent review of application based on approved swimming pool standard plan |
Base fee x 1.5 |
|
18. Temporary structures, such as commercial coaches5 |
Base fee x 2 per structure |
|
19.Temporary use permits |
a. For 4 weeks or less6 |
Base fee x 1.5 |
|
b. For more than 4 weeks6 |
Base fee x 2 |
|
20. Phased Permits |
a. Value < $5,000,000 in value |
Base fee x 1 |
|
b. Value > $5,000,000 in value |
Base fee x 2 |
|
21. ECA Small Project Waiver on a building permit |
None |
SDCI hourly rate; 0.25 hour minimum |
22. Street Improvement Exceptions on a building permit |
SDCI Land Use Hourly x 2 |
Land Use Hourly rate for each review hour spent beyond 2 hour minimum fee |
23. Building Permit Shop Drawings |
None |
SDCI hourly rate: 1.75 hour minimum |
24. Sprinkler Shop Drawings |
None |
SDCI hourly rate: 0.75 hour minimum |
25. Sprinkler Only Permit Submittals (New or Add/Alt) |
Base fee x 0.75 |
See Chapter 22.900G((.)) |
26. Code Alternate Request |
None |
SDCI hourly rate, 2 hour minimum |
27. Commercial Re-Roofing Permit |
Base fee x 0.5 |
|
Footnotes to Table D-2 for 22.900D.010 ((:)) 1The minimum permit fee or plan review fee for value-based fees is (($210)) $216. 2The minimum plan review fee for subject-to-field-inspection (STFI) value-based plan review is (($84)) $86.30. 3This fee is applicable only to those initial tenants that reflect the use and occupancy established in the shell and core permit. The value used shall be the new construction value used in calculating value for the shell and core permit. 4If a swimming pool is located within an enclosed building and is included in the building plans for that building, a separate fee shall not be charged for the swimming pool. The swimming pool area will be considered as floor area of the principal occupancy of the building. 5This fee shall not apply to any on-site, temporary construction office where a valid building permit is in force. 6Master use permit fees for such temporary uses shall be charged according to Table C-1 for 22.900C.010. |
F. Blanket ((Permits)) permits
1. The application fee for a blanket permit to cover initial nonstructural tenant alterations within the first three years of the first tenant alteration permit shall be charged at the rate of (($5.65)) $5.80 per 100 square feet of space to be improved within the life of the permit. A deposit based on the estimated value of the work to be completed during the life of the permit shall be collected at the time of application. As individual tenant spaces are reviewed, the amount of the fee equivalent to the floor space examined shall be deducted from the deposit per Table D-2 for 22.900D.010.
* * *
H. Certificate of Occupancy. The issuance of a Certificate of Occupancy for existing buildings, either if no Certificate of Occupancy has previously been issued or if a change of occupancy is requested, requires a building permit. If there is no construction valuation (there is no work which would require a building permit), the minimum building permit fee shall be assessed. In addition to the minimum building permit fee, if records research, plan examination, or inspection is required, charges shall be assessed at the SDCI hourly rate. If work is being done as authorized by a permit, the permanent Certificate of Occupancy fee is not assessed in addition to the building permit fee. The fee for a temporary Certificate of Occupancy shall be charged at the rate of 1/2 the base fee. The fee for the duplication of a Certificate of Occupancy is (($35.10)) $36.10 unless records research, plan examination, or inspection is required, in which case charges shall be assessed at the SDCI hourly rate.
* * *
Section 5. Section 22.900D.090 of the Seattle Municipal Code, last amended by Ordinance 125184, is amended as follows:
22.900D.090 Permit fees for mechanical equipment and systems, other than boilers and pressure vessels and refrigeration systems
* * *
Table D-8 for 22.900D.090-Permit Fees for Mechanical Equipment |
Type of Installation |
Fee |
Forced air, gravity-type, or floor furnace, gas or oil suspended heater, heat pump, recessed wall heater or floor-mounted space heater, wall furnace, circulating heater or woodstove/fireplace insert, including ducts and burners attached thereto |
(($140)) $143.85 per unit |
New gas or oil burners and newly installed used gas or oil burners1 |
(($140)) $143.85 per unit |
Appliance vents Class A, B, BW, or L if installed separately |
(($111)) $114.05 per unit |
Mechanical air-moving systems |
See Table D-2 for 22.900D.010 |
Appliances or equipment or other work not classed in other categories, or for which no other fee is listed |
Hourly at the SDCI hourly rate. Minimum of 1/2 hour |
Footnote to Table D-8 for 22.900D.090 ((:)) 1See Table D-12 for 22.900D.110 for rates for burners installed by boilers. |
Section 6. Section 22.900D.100 of the Seattle Municipal Code, last amended by Ordinance 125184, is amended as follows:
22.900D.100 Refrigeration equipment and systems
* * *
B. Temporary installations of ten days’ duration or less, made for the purposes of exhibition, display, or demonstration, shall be charged a fee of (($62)) $63.70 for each installation.
Table D-10 for 22.900D.100-REFRIGERATION PERMIT FEES1 |
Type or Size of System/Equipment |
Fee |
Basic fee2 |
(($66)) $67.80 |
Additional installation fee per compressor |
|
0-5 HP |
(($66)) $67.80 |
6-25 HP |
(($134)) $137.70 |
26-100 HP |
(($251)) $257.90 |
101-500 HP |
(($354)) $363.75 |
Over 500 HP |
(($430)) $441.85 |
Repair and alteration (value of work) |
Fee |
$0-$1,000 |
(($66)) $67.80 |
$1,001-$5,000 |
(($96)) $98.65 |
$5,001-$10,000 |
(($166)) $170.60 |
Over $10,000 |
(($164)) $168.50 plus (($66)) $67.80/each $5,000 or fraction thereof of valuation above $10,000 |
Footnotes to Table D-10 for 22.900D.100 ((:)) 1Where the application for permit shows cooling tonnage rather than horsepower, the fees of this table shall apply at a rate of one horsepower equals one ton of cooling capacity. 2The basic fee applies to new installations, repairs, and alterations. |
* * *
Section 7. Section 22.900D.110 of the Seattle Municipal Code, last amended by Ordinance 125184, is amended as follows:
22.900D.110 New installations and alterations of boilers and pressure vessels
* * *
Table D-12 for 22.900D.110-INSTALLATION PERMIT FEES FOR BOILERS AND PRESSURE VESSELS |
Type of Installation |
Installation Fee |
Boilers |
Heated By Combustion Products Heating Surface (In Square Feet) |
Electric Power Input (in KW) |
|
|
0-250 |
0-200 |
(($231)) $237.35 |
|
> 250-500 |
201-400 |
(($343)) $352.45 |
|
> 500-750 |
401-600 |
(($460)) $472.65 |
|
> 750-1,000 |
601-800 |
(($664)) $682.25 |
|
> 1,000 |
Over 800 |
(($840)) $863.10 |
Pressure vessels1 |
Length times diameter in square feet |
|
|
0-15 |
(($155)) $159.25 |
|
> 15-30 |
(($203)) $208.60 |
|
> 30-50 |
(($294)) $302.10 |
|
> 50-100 |
(($379)) $389.40 |
|
> 100 |
(($460)) $472.65 |
Burner2 |
0-12,500,000 Btu/hr |
(($231)) $237.35 (each fuel) |
|
Over 12,500,000 Btu/hr |
(($358)) $367.85 (each fuel) |
Automatic certification |
0-12,500,000 Btu/hr |
(($231)) $237.35 (each fuel) |
|
Over 12,500,000 Btu/hr |
(($358)) $367.85 (each fuel) |
Monitoring System |
Per Boiler |
(($427)) $438.75 |
Footnotes to Table D-12 for 22.900D.110 ((:)) 1Rating size is the product of the two greatest dimensions of the vessel: diameter x overall length for the cylindrical vessels; maximum width x maximum length for rectangular vessels. 2When a burner is installed in conjunction with a boiler, a separate fee shall not be charged for the burner. |
Section 8. Section 22.900D.140 of the Seattle Municipal Code, last amended by Ordinance 125184, is amended as follows:
22.900D.140 New installations and alterations of elevators and other conveyances
* * *
Table D-13 for 22.900D.140-PERMIT FEES FOR ELEVATORS AND OTHER CONVEYANCES |
New Installations and Relocations |
Type of Conveyance |
Fee |
Hydraulic elevators |
(($603)) $619.60 plus (($52)) $53.45 per hoistway opening |
Cabled geared and gearless elevators |
(($1,156)) $1,187.80 plus (($88)) $90.40 per hoistway opening |
Residential hydraulic and cabled elevators |
(($455)) $467.50 |
Dumbwaiters, manual doors |
(($219)) $225 plus (($26)) $26.75 per hoistway opening |
Dumbwaiters, power doors |
(($219)) $225 plus (($62)) $63.70 per hoistway opening |
Escalators and moving walks |
(($1,716)) $1,763.20 plus the following: (width in inches + run in feet + vertical rise in feet) x (($5.25)) $5.40 |
Accessibility lifts (vertical and inclined) |
(($351)) $360.65 |
Material lifts |
(($422)) $433.60 |
Alterations & Repairs |
Type of Conveyance |
Fee |
Accessibility lifts (vertical and inclined) |
(($175)) $179.80 plus (($26)) $26.75 for each $1,000 of construction value or fraction thereof |
Other elevators, escalators, walks, dumbwaiters, and lifts |
(($210)) $215.80 plus (($35)) $36 for each $1,000 of construction value or fraction thereof |
Elevator Cosmetic Alterations Only: |
Weight differential less than or equal to 5% |
(($210)) $215.80 plus (($35)) $36 for each $1,000 of construction value or fraction thereof, to a maximum fee of (($422)) $433.60 |
Weight differential greater than 5% |
(($210)) $215.80 plus (($35)) $36 for each $1,000 of construction value or fraction thereof |
Alteration or replacement of a door opening device |
(($252)) $258.95 per opening device |
Section 9. Section 22.900D.145 of the Seattle Municipal Code, last amended by Ordinance 125184, is amended as follows:
22.900D.145 Site and geotechnical review fee
* * *
Table D-SR for 22.900D.145-SITE AND GEOTECHNICAL REVIEW FEES |
Type of Site Review |
Minimum Fee |
Time at Which Minimum Fee Is Due |
Review Time Included in Minimum Fee |
Time at Which Hourly Fees Are Due |
1. Pre-application site inspection |
3/4 hour at the SDCI hourly rate |
At the time of application intake |
3/4 hour |
At the time of application intake |
2. Drainage or grading review separate from a development permit or as part of a MUP application |
1/2 hour for each type at the SDCI hourly rate |
At the time of application intake |
1/2 hour each |
At the time of permit issuance |
3. Review to determine Environmentally Critical Area exemption |
1/2 hour at the SDCI hourly rate |
At the time of application intake |
1/2 hour |
At the time of decision |
4. ECA Review |
1/2 hour at the SDCI hourly rate |
At the time of application intake |
1/2 hour |
At the time of permit issuance for additional hours beyond minimum |
5. Geotechnical Review (Non-ECA) |
1/2 hour at the SDCI hourly rate |
At the time of permit issuance |
1/2 hour |
At the time of permit issuance for additional hours beyond minimum |
6. Drainage Review |
((1/2)) 1 hour at the SDCI hourly rate |
At the time of application intake |
1 hour |
At the time of permit issuance for additional hours beyond minimum |
7. Post-Issuance Geotechnical Review for all permits with geotechnical special inspections |
1 hour at the SDCI hourly rate |
At the time of permit issuance |
1 hour |
At the time of final inspection, issuance of Certificate of Occupancy, or permit expiration for additional hours beyond minimum |
8. Grading Season Extension Post-Issuance Dry Season Request |
1 hour at the SDCI hourly rate |
At the time of Post Sub Request |
1 hour |
At the time Post Sub is granted, for additional hours beyond minimum |
* * *
Section 10. Section 22.900D.150 of the Seattle Municipal Code, last amended by Ordinance 125184, is amended as follows:
22.900D.150 Electrical permit fees
* * *
Table D-14 for 22.900D.150-ELECTRICAL PERMIT FEES (When Plans Are Reviewed) |
Total Valuation |
Fee |
$0 to $1,000 |
$210 for the first $1,000 of value or fraction thereof |
$1,001 to $5,000 |
$210 for the first $1,000 of value plus $6 for each additional $100 of value or fraction thereof |
$5,001 to $25,000 |
$450 for the first $5,000 of value plus $2.75 for each additional $100 of value or fraction thereof |
$25,001 to $50,000 |
$1,000 for the first $25,000 of value plus $2.50 for each additional $100 of value or fraction thereof |
$50,001 to $75,000 |
$1,625 for the first $50,000 of value plus $2.25 for each additional $100 of value or fraction thereof |
$75,001 to $100,000 |
$2,187.50 for the first $75,000 of value plus $2 for each additional $100 of value or fraction thereof |
$100,001 to $175,000 |
$2,687.50 for the first $100,000 of value plus $8 for each additional $1,000 of value or fraction thereof |
$175,001 to $250,000 |
$3,287.50 for the first $175,000 of value plus $7.50 for each additional $1,000 of value or fraction thereof |
$250,001 to $500,000 |
$3,850 for the first $250,000 of value plus $7 for each additional $1,000 of value or fraction thereof |
$500,001 to $750,000 |
$5,600 for the first $500,000 of value plus $6.50 for each additional $1,000 or fraction thereof |
$750,001 to $1,000,000 |
$7,225 for the first $750,000 of value plus $6 for each additional $1,000 of value or fraction thereof |
$1,000,001 to $1,500,000 |
$8,725 for the first $1,000,000 of value plus $5.50 for each additional $1,000 of value or fraction thereof |
$1,500,001 to $2,000,000 |
$11,475 for the first $1,500,000 of value plus $5 for each additional $1,000 of value or fraction thereof |
$2,000,001 to $2,500,000 |
$13,975 for the first $2,000,000 of value plus $4.50 for each additional $1,000 of value or fraction thereof |
$2,500,001 to $3,000,000 |
$16,225 for the first $2,500,000 of value plus $4 for each additional $1,000 of value or fraction thereof |
$3,000,001 to $3,500,000 |
$18,225 for the first $3,000,000 of value plus $3.50 for each additional $1,000 of value or fraction thereof |
$3,500,001 to $4,000,000 |
$19,975 for the first $3,500,000 of value plus $3 for each additional $1,000 of value or fraction thereof |
$4,000,001 to $4,500,000 |
$21,475 for each additional $4,000,000 of value plus $2.75 for each additional $1,000 of value or fraction thereof |
$4,500,001 to $5,000,000 |
$22,850 for the first $4,500,000 of value plus $2.50 for each additional $1,000 of value or fraction thereof |
$5,000,001 to $10,000,000 |
$24,100 for the first $5,000,000 of value plus $2.25 for each additional $1,000 of value or fraction thereof |
$10,000,001 and up |
(($35,350)) $34,100 for the first $10,000,000 of value plus $2 for each additional $1,000 of value or fraction thereof |
Correction or revision |
SDCI hourly rate, 1 hour minimum |
Get started - after submitting application with plans - branch circuits only |
1/2 base rate plus administrative fee |
Table D-15 for 22.900D.150-ELECTRICAL PERMIT FEES (When Plans Are Not Required) |
1. Administrative Fee |
a. An administrative fee of (($71)) $72.95 will be charged in addition to the other fees specified in this table for all items except subsection 9 of this Table D-15 for 22.900D.150. |
b. A change fee of (($57)) $58.60 will be charged if work is added to an issued permit and if other information is changed. |
2. Services |
Size |
Fee |
a. Services (installation, relocation and temporary installations; size based on conductor ampacity); service fees includes connection to one panel board when a service disconnect is provided ahead of the panel board |
1-125A |
1/2 x base fee |
|
126-200A |
3/4 x base fee |
|
201-300A |
1 x base fee |
|
301-399A |
1.5 x base fee |
|
400-599A |
2 x base fee |
b. Service repair (mast and meter base only) |
Any |
1/2 base fee |
c. Temporary construction power for single-family residence; Ufer ground inspection is included only if the Ufer installation inspection is conducted at the same time as the temporary power inspection |
Any |
1/2 x base fee |
d. Ufer installation only |
Any |
Administrative Fee only |
e. Ufer test only |
Any |
1 x base fee |
f. Underground work (raceways only) |
Any |
1/2 x base fee |
g. SCL Service Meter Project |
Any |
1/2 x base fee; no Administrative Fee |
3. Feeders1 |
Size |
120v-480v |
> 480v |
15-25A |
(($16.65)) $17.10 |
1/4 x base fee |
30-50A |
(($34.75)) $35.45 |
1/4 x base fee |
60-125A |
1/2 x base fee |
1/2 x base fee |
150A & less than 400A |
3/4 x base fee |
1 x base fee |
400A |
plan review required |
plan review required |
4. Connections, Devices, and Branch Circuits2 |
a. Connections |
Fee |
Light outlet, switches, dimmers, receptacles, luminaires, residential-type fans |
(($2.10)) $2.15 each |
Track lighting or multi-outlet assembly |
(($2.10)) $2.15 for every 2 feet of track |
b. Devices and Branch Circuits |
Fee |
Non-electrical furnace 3 |
(($16.70)) $17.15 each |
Dedicated appliances & utilization circuits (cord and plug or direct wired) |
(15-50A) Ranges, water heaters, etc. |
(($16.70)) $17.15 each |
Floodlight4 |
(($7.60)) $7.80 each |
Sign circuit (required for commercial spaces) |
(($43)) $44.20 each |
5. Transformer Installations4 |
Fee |
Up to 300 VA |
(($7.60)) $7.80 |
300 VA to 6 KVA |
(($16.70)) $17.15 |
7 KVA to 15 KVA |
(($51.10)) $52.50 |
16 KVA to 45 KVA |
1/2 x base fee |
46 KVA to 112.5 KVA |
3/4 x base fee |
≥ 113 KVA |
1 x base fee |
6. Motor Installations |
Fee |
Up to 1/3 HP |
(($7.60)) $7.80 |
1/3 HP to 3/4 HP |
(($16.70)) $17.15 |
1 HP to 3 HP |
(($25)) $25.70 |
4 HP to 5 HP |
(($32.50)) $33.40 |
6 HP to 20 HP |
1/4 x base fee |
21 HP to 50 HP |
1/2 x base fee |
≥ 51 HP |
3/4 x base fee |
7. Electrical Furnaces and Heaters |
Fee |
Up to 2 KW |
(($7.60)) $7.80 |
2 KW to 5 KW |
(($16.70)) $17.15 |
6 KW to 15 KW |
(($21.50)) $22.10 |
16 KW to 30 KW |
1/4 x base fee |
31 KW to 100 KW |
1/2 x base fee |
≥ 101 KW |
3/4 x base fee |
8. Low-voltage and Communication Systems |
Fee |
a. Low-voltage systems7 - sound systems, security systems, fire alarms, nurse call, industrial controls, and similar |
Requires separate permit for each system |
Control unit |
(($13)) $13.35 each |
Device (activating, horn, alarm, etc.) |
(($2.10)) $2.15 each |
Control systems (> 100 volts) shall be based on the feeder schedule. |
b. Communications systems8 - voice cable, data cable, coaxial cable, fiber optics, and similar |
The maximum fee is (($499)) $512.75 |
Control unit |
(($13)) $13.35 |
Outlet |
(($2.10)) $2.15 each |
9. Special Events |
a. Inspections occurring during normal business hours - Hourly at the SDCI hourly rate; minimum 1/2 hour |
b. Inspections occurring outside normal business hours - Hourly at the SDCI hourly rate; minimum 1 1/2 hour |
10. Inspections for which no other fee is listed; including but not limited to Conditional Work and “Get Started” permits |
Each |
Hourly at the SDCI hourly rate; minimum 1/2 hour |
11. Renewable Energy Systems (photovoltaic, wind power generation, etc.) |
0 KW to 7.7 KW |
3/4 base fee |
> 7.7 KW to 26 KW |
1 x base fee |
Over 26 KW |
Plan review required |
12. Size overcurrent protection for Electrical Vehicle (EV) charging stations |
Select fee for each charger to be installed. |
Charging Station Level 2A (120-240 V 1 PHASE) Level 2B (120-208 V 3 PHASE) |
Charging Station Level 3 (277-480 V 3 PHASE) |
15 TO 25 AMP CHG STATION |
(($16.60)) $17.05 |
1/4 x base fee |
30 TO 50 AMP CHG STATION |
(($34.75)) $35.70 |
1/4 x base fee |
60 TO 125 AMP CHG STATION |
1/2 x base fee |
1/2 x base fee |
150 TO 225 AMP CHG STATION |
3/4 x base fee |
1 x base fee |
250 TO 400 AMP CHG STATION |
Requires plan review. |
Requires plan review. |
OVER 450 AMP CHG STATION |
Requires plan review. |
Requires plan review. |
13. Selective Coordination Study Review - SDCI hourly rate, 1 hour minimum |
Footnotes to Table D-15 for 22.900D.150 ((:)) 1Feeders will be charged only for (a) subpanels, (b) distribution panels, and (c) branch circuits of 60 amperes or over. 2The residential light outlet fee includes the luminaire. 3For furnaces where service exceeds 25 amperes, provided an additional feeder fee shall not be charged. For furnaces where service is 25 amperes or less, the furnace fee shall not apply provided a feeder fee is charged. 4Outdoor area lighting (parking lots, streets, etc.). The floodlight fee is charged per luminaire. 5The transformer fee includes the primary feeder and one secondary feeder up to and including the first panelboard or disconnect. Additional secondary panelboards or disconnecting means are charged at the appropriate feeder rate. 6Low-voltage systems include, but are not limited to, systems listed in Chapter 7 of the Seattle Electrical Code. Exempt: Residential wireless security systems. 7Communication systems include, but are not limited to, systems listed in Article 770 and Chapter 8 of the Seattle Electrical Code. |
Section 11. Section 22.900D.160 of the Seattle Municipal Code, last amended by Ordinance 125184, is amended as follows:
22.900D.160 Sign, awning, and canopy permit fees
A. Permanent signs. For permanent signs, a permit fee of (($139)) $142.80 shall be charged for the first 32 square feet or less of the total display area of the sign plus an additional charge for each 10 square feet or fraction thereof of total display area in excess of 32 square feet as shown in Table D-16 for 22.900D.160. Adding any on-premises business sign with over 5 square feet of area to an existing structure requires a permit.
Table D-16 for 22.900D.160-Permanent Sign fees |
Permanent Sign Size |
Marginal Rate for Additional Charge |
Applied Fee |
0 to 32 sq. ft. |
|
(($139)) $142.80 for the first 32 sq. ft. or fraction thereof |
32 to 100 sq. ft. |
(($22.60)) $23.25 |
(($139)) $142.80 for the first 32 sq. ft. plus (($22.60)) $23.25 per additional 10 sq. ft. or fraction thereof |
100 to 150 sq. ft. |
(($24.94)) $25.65 |
(($297.20)) $305.55 for the first 100 sq. ft. plus (($24.94)) $25.65 per additional 10 sq. ft. or fraction thereof |
150 to 200 sq. ft. |
(($24.94)) $25.65 |
(($421.90)) $433.80 for the first 150 sq. ft. plus (($24.94)) $25.65 per additional 10 sq. ft. or fraction thereof |
200 to 250 sq. ft. |
(($27.53)) $28.30 |
(($546.60)) $562.05 for the first 200 sq. ft. plus (($27.53)) $28.30 per additional 10 sq. ft. or fraction thereof |
250 to 300 sq. ft. |
(($27.53)) $28.30 |
(($684.25)) $703.55 for the first 250 sq. ft. plus (($27.53)) $28.30 per additional 10 sq. ft. or fraction thereof |
300 to 350 sq. ft. |
(($30.39)) $31.25 |
(($821.90)) $859.80 for the first 300 sq. ft. plus (($30.39)) $31.25 per additional 10 sq. ft. or fraction thereof |
350 to 400 sq. ft. |
(($30.39)) $31.25 |
(($973.85)) $1,016.05 for the first 350 sq. ft. plus (($30.39)) $31.25 per additional 10 sq. ft. or fraction thereof |
400 to 450 sq. ft. |
(($33.54)) $34.45 |
(($1,125.80)) $1,188.30 for the first 400 sq. ft. plus (($33.54)) $34.45 per additional 10 sq. ft. or fraction thereof |
450 to 500 sq. ft. |
(($33.54)) $34.45 |
(($1,293.50)) $1,188.30 for the first 450 sq. ft. plus (($33.54)) $34.45 per additional 10 sq. ft. or fraction thereof |
500 to 550 sq. ft. |
(($37.02)) $38.05 |
(($1,461.20)) $1,550.80 for the first 500 sq. ft. plus (($37.02)) $38.05 per additional 10 sq. ft. or fraction thereof |
550 to 600 sq. ft. |
(($37.02)) $38.05 |
(($1,646.30)) $1,741.05 for the first 550 sq. ft. plus (($37.02)) $38.05 per additional 10 sq. ft. or fraction thereof |
600 to 650 sq. ft. |
(($40.86)) $42 |
(($1,831.40)) $1,951 for the first 600 sq. ft. plus (($40.86)) $42 per additional 10 sq. ft. or fraction thereof |
650 sq. ft. and up |
(($45.10)) $46.35 |
(($2,035.70)) $2,185.75 for the first 650 sq. ft. plus (($45.10)) $46.35 per additional 10 sq. ft. or fraction thereof |
* * *
D. Wall Signs. The maximum fee for signs painted on or otherwise applied directly to the building wall without a frame or mechanical fasteners is (($636)) $653.50.
* * *
Section 12. Section 22.900E.020 of the Seattle Municipal Code, last amended by Ordinance 125184, is amended as follows:
22.900E.020 Boiler and pressure vessel certificates of operation
* * *
Table E-1 for 22.900E.020-Fees for Certificates of Operation for Boilers and Pressure Vessels |
Type of Installation |
Reinspection and Certificate Fee |
Boilers2 |
Heating By Combustion Products Heating Surface (In Square Feet) |
Heated By Electricity Electric Power Input (In KW) |
|
|
0-250 |
0-200 |
(($137)) $140.75 |
|
251-500 |
201-400 |
(($255)) $262 |
|
501-750 |
401-600 |
(($375)) $385.30 |
|
751-1,000 |
601-800 |
(($577)) $592.90 |
|
Over 1,000 |
Over 800 |
(($713)) $732.60 |
Controls and limit devices for automatic boilers (Charged in addition to those fees listed above) |
Automatic boilers (input) 0-12,500,000 Btu Over 12,500,000 |
|
Annual (($137)) $140.75 (($170)) $174.70 |
Monitoring systems for automatic boiler (Charged in addition to those fees listed above) |
Annual (($340)) $349.35 |
Unfired pressure vessels1,2 |
|
Rating Size 0-15 16-30 31-50 51-100 Over 100 |
Biennial (($79.50)) $81.70 (($137)) $140.75 (($223)) $229.15 (($290)) $298 (($427)) $438.75 |
Domestic water heaters located in Group A, E, or I Occupancy |
Biennial (($52)) $53.45 |
Footnotes to Table E-1 for 22.900E.020 ((:)) 1Rating size is the product of the two greatest dimensions of the vessel: diameter x overall length for the cylindrical vessels; maximum width x maximum length for rectangular vessels. 2Fees for low-pressure hot water supply boilers installed prior to January 1, 1989, consisting of tanks whose contents are heated by electric elements shall be charged at the same rates that apply to unfired vessels of the same size. |
Section 13. Section 22.900E.030 of the Seattle Municipal Code, last amended by Ordinance 125184, is amended as follows:
22.900E.030 Fees for elevator certificates of inspection
* * *
Table E-2 for 22.900E.030-Fees for Elevator Certificates of Inspection |
Type of Conveyance |
Fee for Each Conveyance |
Hydraulic elevators |
(($193)) $198.30 |
Cable elevators1,2 |
(($263)) $270.25 plus (($20.20)) $20.75 for each hoistway opening in excess of two |
Sidewalk elevators |
(($175)) $179.80 |
Hand-powered elevators |
(($175)) $179.80 |
Dumbwaiters |
(($175)) $179.80 |
Escalators and moving walks |
(($263)) $270.25 |
Accessibility lifts (vertical and inclined) |
(($175)) $179.80 |
Material lifts |
(($175)) $179.80 |
Fire emergency systems, Phase I or both Phase I and Phase II |
(($88)) $90.40 |
Footnotes to Table E-2 for 22.900E.030 ((:)) 1Elevators having a continuous hoistway wall of 100 feet or more without openings shall be charged a fee of (($427)) $438.75 plus (($19.65)) $20.20 for each hoistway opening in excess of two. 2The fee for roped hydraulic elevators is the same as cable elevators. |
Section 14. Section 22.900E.040 of the Seattle Municipal Code, last amended by Ordinance 125184, is amended as follows:
22.900E.040 Refrigeration systems annual operating permit fee
* * *
Table E-3 for 22.900E.040-Refrigeration Systems Annual Operating Fees |
Size of equipment |
Fee |
0-50 HP |
(($132)) $135.65 |
51-100 HP |
(($201)) $206.55 |
Over 100 HP |
(($284)) $291.80 |
Section 15. Section 22.900E.050 of the Seattle Municipal Code, last amended by Ordinance 125184, is amended as follows:
22.900E.050 Boiler, refrigeration, and gas piping licenses and examinations
* * *
Table E-4 for 22.900E.050 - Fees for Boiler, Refrigeration, and Gas Piping Licenses and Examinations |
License fees: |
|
Refrigeration Contractor |
|
Class A |
(($225)) $231.20 |
Class B |
(($225)) $231.20 |
Class C |
(($359)) $368.90 |
Journeyman refrigeration mechanic |
(($100)) $102.75 |
Refrigeration operating engineer |
(($100)) $102.75 |
Steam engineers and boiler firemen (all grades) |
(($100)) $102.75 |
Boiler supervisor, all grades |
(($111)) $114.05 |
Gas piping mechanic |
(($100)) $102.75 |
Examination fees - all licenses |
(($45)) $46.25 |
Section 16. Section 22.900E.060 of the Seattle Municipal Code, last amended by Ordinance 125184, is amended as follows:
22.900E.060 Registration of special inspectors
* * *
C. The fee for renewal of a special inspector certificate of registration covering one or more types of inspection for which the registrant has been qualified is (($55)) $56.50.
* * *
Section 17. Section 22.900F.010 of the Seattle Municipal Code, last amended by Ordinance 125184, is amended as follows:
22.900F.010 Monitoring vacant buildings
* * *
Table F-1 for 22.900F.010-Monitoring Vacant Buildings |
Condition of Premises |
Fee |
Building is closed to entry and premises are in compliance with applicable codes. |
(($247)) $253.80 |
Building is closed to entry and premises are not in compliance with applicable codes. |
(($411)) $422.30 |
Building is not closed to entry regardless of compliance with applicable codes. |
(($493)) $506.55 |
* * *
Section 18. Section 22.900F.020 of the Seattle Municipal Code, last amended by Ordinance 124919, is amended as follows:
22.900F.020 Noise fees
* * *
Table F-2 for 22.900F.020 - NOISE FEES |
Type |
Permit Fee |
Land Use Review |
Other Project Hourly Fees |
Inspection and Enforcement |
Temporary noise variance (No separate fee when issued as part of a master filming permit) |
SDCI base fee x 1 |
None |
None |
((SDCI hourly rate - 1 hour minimum1)) 1/2 the number of days of the permitted Night Time Noise Variance x 1/4 the SDCI base fee |
Table F-2 for 22.900F.020 - NOISE FEES |
Economic, Technical, or Major Public Project variance |
SDCI base fee x 1 |
Land Use hourly rate |
SDCI hourly rate - 2 hour minimum |
SDCI hourly rate - 2 hour minimum1 |
Noise survey reviews, inspections and monitoring on Land Use and Construction permits |
None |
None |
SDCI hourly rate - 0.5 hour minimum |
None |
Footnote to Table F-2 for 22.900F.020 ((:)) 1Inspection and Enforcement Minimum fee shall be paid at the time of Permit Issuance, any hourly fees beyond the minimum shall be paid prior to permit Final or Occupancy. |
Section 19. Section 22.900G.010 of the Seattle Municipal Code, last amended by Ordinance 125184, is amended as follows:
22.900G.010 Fees for Department of Neighborhoods review
* * *
E. Environmental (SEPA) ((Review)) review of ((Projects)) projects. Review of referrals pursuant to subsections 25.05.675.H.2.c and 25.05.675.H.2.d by the City Historic Preservation Officer is charged at (($280)) $288 an hour.
F. Landmark ((Reviews)) reviews. Review of a building, site, or object’s eligibility as a Seattle landmark pursuant to ((Section)) section 25.05.800.B or upon request is charged at (($280)) $288 an hour.
G. Requests for reviewing character structure TDP sending sites in the Pike/Pine Conservation Overlay District. The Department of Neighborhoods’ hourly review fee is (($280)) $288 an hour for determining whether a character structure may, if requested by a property owner, be added to the list of character structures in the Seattle Department of Construction and Inspections Director’s Rule promulgated according to Section 23.73.005.
Section 20. Section 22.900G.020 of the Seattle Municipal Code, last amended by Ordinance 124047, is amended as follows:
22.900.G.020 Fees for review by the Seattle Department of Transportation
The fees for Seattle Department of Transportation Review (subsections 22.900A.040.B and 22.900A.040.C and Section 15.04.074) shall be collected by the Department for transfer to the Department of Transportation, or may be collected directly by the Seattle Department of Transportation. The fees are for review and inspection services associated with the following:
1. School Use and School Development Advisory Committee;
2. Major Institution Master Plans;
3. Development (MUP) review;
4. Pre-development submittal conferences and coordination;
5. Traffic impact analysis; and
6. Shoring and Excavation.
Section 21. Section 22.900G.080 of the Seattle Municipal Code, last amended by Ordinance 125184, is amended as follows:
22.900G.080 Design Commission fees
* * *
D. Special ((Exceptions)) exceptions. The Commission will bill non-City projects at the hourly rate of (($109)) $112 an hour per Commissioner for subcommittee review, or (($770)) $791 an hour for full Commission review, except that fees may be waived, in whole or in part, at the discretion of the Commission with the concurrence of the City Budget Director in the following circumstances:
1. Whenever Commission fees, if charged, would be disproportionate to the sums available and could cause abandonment of the project for the following types of projects: artworks, projects funded by grants and donations, neighborhood self-help projects undertaken by volunteers and nonprofit organizations, and small capital improvements;
2. For low-income and special needs housing projects subject to Design Commission review.
E. Street ((Use Permit Reviews)) use permit reviews. Street use permit reviews, which are required before issuance of a street use permit for improvements within the public right-of-way, will be billed at the hourly rate of (($109)) $112 an hour per Commissioner for subcommittee review, or (($770)) $791 an hour for full Commission review. Billing will be sent to the Seattle Department of Transportation for inclusion into the plan review costs charged to the applicant, or be billed directly by the Department. For those projects billed through the Seattle Department of Transportation, payment will be made by a fund transfer from the Seattle Transportation Operating Fund to the Department Operating Fund from funds paid by the applicant.
F. Early Master Use Permit ((Stage or Projects Outside)) stage or projects outside City ((Contract Process)) contract process. For design review at an early Master Use Permit stage or for projects outside The City of Seattle contract award process, Design Commission fees will be billed by the Department at an hourly rate of (($109)) $112 an hour per Commissioner for subcommittee review, or (($770)) $791 an hour for full Commission review.
Section 22. This ordinance shall take effect on January 1, 2018.
Passed by the City Council the ____ day of ________________________, 2017, and signed by me in open session in authentication of its passage this _____ day of ___________________, 2017.
____________________________________
President __________ of the City Council
Approved by me this ____ day of _____________________, 2017.
____________________________________
Tim Burgess, Mayor
Filed by me this ____ day of __________________________, 2017.
____________________________________
Monica Martinez Simmons, City Clerk
(Seal)
|